Purifying capacity 3300 habitants – equivalent
Location Berlanga (Badajoz)
Purifying system ECODISC Biodiscs 3600 in civil engineering
Treatment line Initial pumping

Pretreatment – sifting and desanding

Decantation-Digestion

ECODISC Biodiscs

P elimination chemically with FeCl3

Secondary decanter
 ECODISC Biodiscs Discs diameter: 3600 mm

Number of steps: 4 in 2 lines

Total area: 25.344 m2

Power: 2×7,5 kw

Rotary treadmill at entrance, biodiscs and exit towards decanter
Year of construction 2018
Process PREDENITRIFICATION + NITRIFICATION
Water discharge DBO5<25 ppm; N<15 ppm; MES<35 ppm