Purifying capacity | 3300 habitants – equivalent |
Location | Berlanga (Badajoz) |
Purifying system | ECODISC Biodiscs 3600 in civil engineering |
Treatment line | Initial pumping
Pretreatment – sifting and desanding Decantation-Digestion ECODISC Biodiscs P elimination chemically with FeCl3 Secondary decanter
|
ECODISC Biodiscs | Discs diameter: 3600 mm
Number of steps: 4 in 2 lines Total area: 25.344 m2 Power: 2×7,5 kw Rotary treadmill at entrance, biodiscs and exit towards decanter
|
Year of construction | 2018 |
Process | PREDENITRIFICATION + NITRIFICATION |
Water discharge | DBO5<25 ppm; N<15 ppm; MES<35 ppm |